On the building to promote energy saving and technology of China indicates the heat preservation plate industry development will have stronger motivation. Chinese exterior wall thermal insulation needs to upgrade existing buildings about 13 billion square meters, the new construction need to do heat preservation processing of about 10 billion square meters.
Predicts 2015, the wall heat insulation board with ultra-thin technology can promote the implementation of the construction area of about 1.7 billion square meters, can form the annual energy saving capacity of about 2.45 million tce. In addition, 20% of new buildings at the end of 2015 in cities and towns shall meet the requirements of green building standards. China will be completed during the "twelfth five-year" northern heating areas heat metering and existing residential buildings 400 million square meters, existing residential buildings in hot summer and cold winter area energy saving renovation of 50 million square meters, public building energy saving renovation of 120 million square meters of office buildings and public institutions, the implementation of rural order 400000 sets energy-saving demonstration.
Wall with thin insulation board construction process: Basic level processing, cement mortar leveling, preparation of adhesive mortar, paste the wall insulation board, put the first time of plastering mortar, the shop is stuck alkali glass fiber grid cloth, wipe the second time of plastering mortar, overall inspection, act the role of road surface construction, check and accept